General Characteristics | |
T2 V84.3 A gas turbines |
2 heat recovery boilers |
1 steam turbine | |
Power | |
Simple cycle 2 x approx. 157 MW | Combined cycle 160 MW TV + 25 MW |
Additional fire, approx. | |
Installed capacity: 485 MW | Effective capacity: 479.3 MW |
Commissioning | |
First boiler: July 2006 | Second boiler: September 2006 |
Location: District of Ventanilla, Province of El Callao. | Type: Combined cycle thermal power plant. |
Ventanilla