General Characteristics
Installed capacity: 30 MW
Gross height of all: 177 m.
Effective capacity: 30.9 MW
Turbine type: Francis; horizontal axis
Average annual generation: 235 GWh
Number of units: 2
Flow rate: 21 m3/seg.
Commissioning (first unit): 1960
Location: 16 km east of Lima. District of Lurigancho, Province of Lima, Department of Lima.
Type: Run-of-the-river power station. Water comes from the Rímac and Santa Eulalia Rivers.