General Characteristics
Installed capacity: 69.15 MW
Gross height of fall: 468 m.
Effective capacity: 69.2 MW
Turbine type: Pelton; Horizontal axis
Average annual generation: 468 GWh
Number of units: 3
Flow rate: 17.5 m3/seg.
Commissioning (first unit): 1951
Location: 40 km east of Lima. District of Lurigancho, Province of Lima, Department of Lima.
Type: Run-of-the-river power station. Water comes from the Rímac and Santa Eulalia Rivers.